Case study · Power micropiles
Aragorn Substation
74 battered 4½-inch micropiles, installed in seven days, to support transmission lines at the Titan-Aragorn Solar Substation in Culberson County, Texas.
The project
Aragorn Substation
Applied High Voltage, a subsidiary of worldwide renewable energy contractor Signal Energy, contracted Park Range Construction to install the foundations for transmission lines at the Titan-Aragorn Solar Substation in Culberson County, Texas.
The site was extremely remote, and conditions were very hot and dry. Our crew drilled 74 battered 4½-inch micropiles to a depth of 14 feet, completing the installation in seven days.
Five load tests were performed to confirm the design.
Scope of work
- 74 battered 4½-inch micropiles
- Drilled to 14 ft depth
- Installed in 7 days on a remote site
- Five load tests

More case studies
Erie Fire Station No. 15 →Mead Fire Station No. 14 →Red Rocks Stage Roof →Windsor High School →Falcon Crane →Dave Johnson Power Plant →Crawford Gulch MSE Wall →Aero FNL, Loveland Airport →Izakaya Den →CSU Allison Hall →Broncos Practice Facility →St. Paul Catholic High School →New Lyons Bridge →KSE Altitude Sports Radio →Ridgway Residential Underpin →Anthem Ranch →71 Homes, Aurora →Six-Unit Townhome Underpin →
Have a similar project?
Send your plans, specs and bid date, and our estimators will get you a number.