Aragorn Substation

74 battered 4½-inch micropiles, installed in seven days, to support transmission lines at the Titan-Aragorn Solar Substation in Culberson County, Texas.

The project

Aragorn Substation

Applied High Voltage, a subsidiary of worldwide renewable energy contractor Signal Energy, contracted Park Range Construction to install the foundations for transmission lines at the Titan-Aragorn Solar Substation in Culberson County, Texas.

The site was extremely remote, and conditions were very hot and dry. Our crew drilled 74 battered 4½-inch micropiles to a depth of 14 feet, completing the installation in seven days.

Five load tests were performed to confirm the design.

Scope of work

  • 74 battered 4½-inch micropiles
  • Drilled to 14 ft depth
  • Installed in 7 days on a remote site
  • Five load tests