Park Range Construction was contracted to install over 119 Magnum 3” Reinforced Tubular Helical Piers for the new restaurant foundation. The site required the operation of drilling rigs which could operate in tight quarters between two existing buildings. Due to the nature of the hard soils and a 60 LF depth requirement, holes were pre‐drilled with a TEI skid mounted rock drill. In order to complete the job on schedule, we used multiple drilling rigs simultaneously. Although the drilling conditions were challenging, the job was successfully completed in a timely manner. Client:Jordy Construction | Owner:Izakaya Den | Engineer of Record:Performance Engineering| Engineers—Structural:Magnum Geo‐Solutions | Architect: Roth Sheppard Architects| Engineers—Geotechnical: CTL Thompson |
Published on 5-22-2015